Coolsivna Construction wins the contract for an Extension to the existing School which consists of the following; replacement of existing prefabricated classroom buildings with four classrooms, an additional ASD Classroom and Ancillary rooms in two structures one single storey to the front and one two storey to the side of the existing school. Gross floor space 695 sqm proposed, 370sqm demolition in the townland of Oranmore.